Santa Ana Santa Fe Channel Rehabilitation

Repairs performed on the Santa Fe Concrete Channel. Scope included mending cracks with epoxy injections, repair concrete spalling and rebar, repair washout around inlet CMP to drain with imported backfill and AC, regrade service road towards train, and backfill and rebuild riprap to restore as-built conditions.

Midway Pavement Rehab

Removal and replacement of PCC access ramps, cross gutters, roadways sections, AC pavement, and road markings and striping on various location of Midway City, Orange County.

Shauer Street Improvements

Replacement of pavement, driveways, and sidewalks on Shauer Street, Los Angeles. Scope included tree trimming, tree pruning, and grading for sub base and hardscape areas.

West Athens Phase 1

Replacement of pavement, driveways, and sidewalks on various locations in West Athens, Los Angeles. Scope included tree trimming, tree pruning, and grading for sub base and hardscape areas.

Alhambra Courthouse Roof Replacement

Installation of new Class-A fire-rated single-ply roofing system at the Alhambra Courthouse. Scope included the removal of the existing coal-tar pitch roofing system, installation of 37,250 SF of new single ply roofing system, and installation of new sheet metal, gutters, down spouts, and walk pads.

Torrance Courthouse

Complete roof replacement of an existing roofing system to a Single Ply roofing system.

California Market Place

Installation of new roofing system, sheet metal, and accessories for new ground up construction.

Western & San Marino Mixed Use

Installation of roofing system, below grade waterproofing, and deck coatings for a new ground up residential apartment building.