Removed 1,400 SF of existing decomposed granite and associated form boards along the North, West and South side of the College of Extended and Global Education building. Removed soil to provide final concrete finish around areas of the existing building. Recompacted area and installed a concrete sidewalk with rebar reinforcement, thickened edge slab and brook finish with sawcut expansion joints. The project was completed according to the California Building Code (CBC) and all State and Regional Codes.