Construct soundwall between school and interstate 10 freeway. Scope includes, install concrete piles and foundation, install masonry walls, repair driveways/sidewalks/curbs, install new electrical meter and backflow for irrigation, install trees and scrubs, and setting up/dismantling traffic control measures.