Complete repair of the interior and exterior finishes and renovation of men’s women’s latrines. Scope includes, demolition of existing restrooms, install new water and electrical piping at restrooms, install new plumbing fixtures, light fixtures, door, flooring, ceiling, and paint. Also, an existing accordion sliding door was removed and replaced. Lastly, the exterior fascia was repaired at various buildings.