Scope included repairing by replacement the heating boiler systems at Point Mugu buildings 1, 24, 25, 68 and 362 and Port Hueneme buildings 1300 and 1417 and repairing any surfaces damage caused during demolition and installation of the new heating boilers and associated valves, tanks, pipe, control systems and power.







