The FCC Lompoc was constructed in 1946 of cast in place concrete. MIK performed the complete tear off and installation of new APP modified bituminous membrane roofing system on the Housing Units, Administration, Intel Room IR, Visitor VR, Medical Service, and Control CL. Scope included the reinstallation of mechanical equipment, gas piping, surveillance cameras and electrical conduits, cut out concrete parpets for new scuppers and overflows along installation of new down spouts.