Repairs performed on the Santa Fe Concrete Channel. Scope included mending cracks with epoxy injections, repair concrete spalling and rebar, repair washout around inlet CMP to drain with imported backfill and AC, regrade service road towards train, and backfill and rebuild riprap to restore as-built conditions.