Biological Science Roof Replacement

Scope included demolishing 41,000 SF of existing upper and lower roofing at the Biological Sciences building and installing a new PVC roofing system. Demoing to deck, performing sheathing repairs, installing PVC roofing system, flashing and sealing. Work also included abatement of ACM at parapet walls, as well as safeoff, relocation, and reinstallation of all existing […]

Pepperbrook Channel Wall Repair

Scope included removing and replacing existing collapsed retaining wall. Installed 32 column piles for the new retaining wall.

Corporate Center – Floors 1-5

Scope included tenant improvement: replacing storefront, replacing ceiling tiles, painting walls, adding new lighting, adding new cubicles, adding fire sprinklers, repairing existing window seals, installing new insta-hot systems, and replacing carpet.

North Dorm Rooms to Refurb

Scope included refurbishing existing dormitory rooms, restrooms, lavatories, and associated common areas. Work includes abatement/remediation of hazmat, drywall repair/replacement, plumbing fixture installation, HVAC verification, electrical adjustments, finish restoration, and final cleaning to prepare rooms for student occupancy.

Replace Boilers at PM1, PM24, PM25, PM68, PM362, PH1300 & PH1417

Scope included repairing by replacement the heating boiler systems at Point Mugu buildings 1, 24, 25, 68 and 362 and Port Hueneme buildings 1300 and 1417 and repairing any surfaces damage caused during demolition and installation of the new heating boilers and associated valves, tanks, pipe, control systems and power.

North Collections Replacement HVAC

Scope included removal and replacement of existing 25 ton packaged rooftop unit including reconnection to electrical, ductwork, condensate drain piping and controls and BACNET integration.