Seal Beach Pump Station

Scope included removing the existing ACM pipe and replace with stainless steel pipe, removing broken flap gates with new flap gate, removing corroded fence and installing new stainless steel fence.

Union Market Station – Kiosks

Scope included constructing new vendor kiosk with power, water, drain-waste-vent hookups on the Concourse Level of Union Square/Market Street MUNI Metro Station.

VCMC North Tower MRI

Scope included renovating existing shell space into a new MRI exam room, control room, and support equipment room. Provided new RF shielded protection within room enclosure in which MRI unit sits. Provided new MRI unit and MEP pipes and conduits. Provided new interior finishes within project scope of work area.

SFMTA Chinatown Station Glass Artwork Installation

Scope included furnishing and installing structural framing for new custom glass artwork to be installed in Chinatown Station Plaza level parapet wall. Glass was mounted upon completion of structural framing.

Sloman Building 3F Tenant Improvement

Scope included demolition of entire 2nd floor and partial 3rd floor walls, ceilings and flooring, demolition of the entire stairwell, remodeling of the partial 3rd floor and 1st floor and parking lot ADA improvements and installation of the new code compliant stairwell.

Marbella Country Club Emergency Sink Hole Repair

Installation of shoring box. Installation of corrugated piping. Installation of solider beam. Grading work per engineer’s grading plan. Golf Course landscaping and irrigation. Upgrades to sidewalk, curb and asphalt road.

Civic Center Central Plant – COGEN AQMD

Demolition of existing interior facilities. Installation of AQMD boilers and chillers. Installation of structural pads, mechanical piping, plumbing piping and electrical service.