Ojai Hall Chiller Installation

Removal of existing air-cooled chiller (hauled away and sent to recycling). Removed existing conduits and wires from the service disconnect to the existing chiller, added alternate to replace the existing disconnect with a new one. Installed new conduits and wires from existing disconnect to new chiller locations, furnished and installed one air cooled, 78-ton nominal […]

Bell Tower Central Window Replacement

Removed and disposed existing class II non-friable asbestos containing materials (ACM) window putty on windowpanes. Provided new exterior windows, including 95” x 53”, 47’ x 53”, 60” x 53”, 91” x 96”, 91” x 100” (Arch), 46” x 60”. Provided Arcadia 200T Windows prefinished brick red Kynar campus standards, 1” solar ban 60 insulated glass. […]

16th Street Linac Installation

Installation of a Linear Accelerator inside of a cancer treatment medical facility. Scope included radiation shielding, reinforcement of concrete walls, and dedicated power control and cooling system for the Linear Accelerator.

USPS La Habra Main Office

Installation of new PVC roofing system at the La Habra Post Office USPS Facility. Scope included the demolition of the existing roof system and installation of 34,000 SF of new PVC.

Pavilion Building VSI

Perform seismic improvements at Pavilion Building for reclassification to Structural Performance Category 2 (SPC2) on a six story, 255 bed hospital building. Scope includes, selective demolition to expose structure, install fiberwrap reinforcement polymer and/or structural column cap at various locations, relocate MEP interfering/adjacent to column location, setup/dismantle temporary ICRA barricades, and install finishes including drywall, […]

SHF Lynwood Sheriff ReRoof

Installation of new 4-ply roofing system at the Lynwood Regional Justice Center. Scope included the tear-off and installation of 76,000 SF of 4-ply roofing system, installation of flashings, and sheet metals.

USPS San Jose (P)

Installation of new PVC roofing System at the USPS San Jose Foothill Station USPS Facility. Scope included the tear off of the existing roofing system, installation of new 11,200 SF PVC roofing system, installation of roof curb flashings, parapet wall flashings, counterflashings, and tubular penetration flashing, and installation of new Kattsafe Guardrail System GR36.