USPS Irvine Harvest Station
Installation of new PVC roofing system at the Irvine Harvest Station Post Office USPS Facility. Scope included the demolition of the existing roofing system, and installation of 66,800 SF of new PVC.
USPS El Centro
Installation of new PVC roofing system at the El Centro Post Office USPS Facility. Scope included the demolition of the existing roofing system and installation of 22,000 SF of new PVC.
USPS Santa Clarita
Installation of new PVC roofing system at the USPS Santa Clarita P&DC Facility. Scope included the removal of the existing roofing system, sheet metal, skylights, and smoke hatches, repair of substrates, raising of existing curbs, and installation of new 680,000 SF PVC roofing system, sheet metal, 447 skylights, and 110 smoke hatches.
Sierra Hall 134 Tenant Improvement
Tenant Improvement at the Sierra Hall 134 Suite at California State University, San Bernardino. Scope included the selective demolition, asbestos abatement, remodel of the lobby area which included new service windows, countertops, automatic roll up doors, and flooring.
LACC Main Lodge Roof Replacement
Installation of a new shingle roof system on the Main Lodge at UCLA Lake Arrowhead Lodge. Scope included demolition and installation of 21,000 SF shingle roof.
STRB 1109 LINAC
Construction of a shielded room and renovation of second floor laser lab and accelerator control room. Scope includes, install a 4’-0” thick concrete wall and ceiling inside a laboratory building, install lead shielded door, complete renovation including MEP for the shielded room/laser lab/control room, add two air handing units to accommodate additional HVAC loads, and […]
Health Care Agency – 17th Street Renovations
Renovation of county operated Medical Facility. Scope included demolition and installation of new t-bar ceilings, lighting fixtures, flooring, plumbing fixtures, partitions, and ceramic tiles in existing restrooms. Demolition and renovation of existing interior reception area and security office into a new reception area and security office. Installation of new casework, kitchen sink, water fountain, exhaust […]
FPH CT Scan Replacement
Renovation of CT scan room and imaging control center at the Foothill Presbyterian Hospital. Scope included the removal of the existing CT equipment, upgrade of the infrastructure to provide adequate support for new equipment and control systems, architectural modernizations which included lead shielding, static resistant vinyl flooring, air supplies and ventilations, lighting controls, automatic doors, […]
16th Street MOB Chiller Replacement
18-ton chiller replacement for a dedicated cooling system for an MRI unit in an occupied medical facility. Scope included steel structural reinforcement, new electrical connections, new chilled water lines, roof repairs, and ADA upgrades to the restroom and parking areas. CLIENT: UCLA Health