Repair Latrines HOLDERMAN

Complete renovation of men’s and women’s latrines. Scope includes, design package of restrooms, demolition of all sewer/domestic lines, install new plumbing pipe at in-wall and ceiling, install new plumbing fixtures, light fixtures, door/frame, ceramic tile walls and flooring, hard lid ceiling, and paint.

Repair/Replace Laterals and Backflow Devices and Replace Fire Alarm

Renovate existing fire sprinkler system contaminated with AFFF system and reinstall new domestic/fire laterals to buildings PM333 and PM372. Scope includes, decommission existing AFFF system, triple rinse fire sprinkler system, survey/repair existing fire alarm system, and demolition/installation of new underground water laterals.

Repair Boilers PM 67 & PM 372

Replace existing boiler systems with an updated more efficient boiler systems at buildings PM67, PM372. These boilers were out of commissioned boilers due to not meeting emission requirements of the new EPA standards. Scope includes removal and installation of new Raypak Hi-Delta hydronic boilers and components related.

Replace HVAC and Fire PM771

Replace existing gas fired HVAC Rooftop Unit with a new Rooftop Packaged unit (Heat pump) with an economizer. Also requires the full replacement of existing Fire Alarm System including designing a new system based on end user needs. The scope includes, demolition of the existing system, replacement of RTU with new electrical components, provide a […]

Repair Air Handler Units and Installation of VFDs at PH1

Replace existing HVAC system with new. Scope includes, replacing (8) RTU units and related components, replace air handler damper actuators and service dampers, replace CRAC Unit with piping, control and electrical connections Replace a fully functional air-handling unit (AHU) with new VFDs. Also, replace (5) existing variable frequency drives (VFD) with new on various units […]

Repair AHUs CM PH 1169

Replace existing (10) air-handling unit. Scope includes removal and installation of (5) 5 ton and (5) 7 ton new air handlers and components, disconnect and reconnect electrical, and reprograming of the building controls.

Repair Fire Alarm System

Replace existing fire alarm devices with new code compliant system. Scope includes design of new fire alarm system with new layout of building, replace all fire alarm devices such as fire alarm control panel, smoke detectors, heat detectors, and drywall/paint as required per new location of fire alarm devices.

Repair Latrines Munemori

Complete renovation of men’s and women’s latrines. Scope includes, design package of restrooms, demolition of all sewer/domestic lines, install new plumbing pipe at in-wall and ceiling, install new plumbing fixtures, light fixtures, door/frame, ceramic tile walls and flooring, hard lid ceiling, and paint.