25 VN Sidewalk Waterproofing
Work performed included grinding concrete sidewalk surface and applying coating system. Scraped, primed and painted doors and door frames to the top of transom and sidelight frames.
USPS Los Angeles CA PDC Roof Replacement
Removal and replacement of existing roof system down to the structural deck, including roof membranes, underlying insulation, underlayments, and additional roof membranes.
X011 Reconfigure Bldg 1402 Interior
Construction of a 1,400 SQFT training facility for NAVFAC Fort Worth JRB with two classrooms and break area for a specialized training room inside of the airplane hangar Building 1402. The unique challenge was building the load bearing structure with horizontal diaphragm and vertical shearwalls. Scope included a ground up structure from concrete pad, structural […]
X017 HVAC System PM 774
Provided new energy efficient dual zone ductless heat pump systems with both heating and cooling capabilities in each of the 16 suites. Each suite is approximately 738 square feet of floor area.
X016 – Repair by Replacement the Existing Failing Fire Alarm System
Installation of interior and exterior fire alarm system with MNS at Port Hueneme building 1169 complete and ready for use.
X013 – Repair – Replace Laterals and Backflow Devices, Repair Fire Alarm
Removed the existing, failed, fire alarm components, the AFFF detection and triggering panel and AFFF detection devices, conduits and wires and hangar bay sprinkler system alarm valves, gate valves, flow detection services and sprinkler heads. Installed new pipe sprinkler valves, new gate valves, flow detectors and new sprinkler heads.
X002 – HVAC Upgrade for PH1387 and PH1388
Repaired air handler damper actuators and service dampers at PH1387, replace RTU united and associated condensers on the roof at PH1387, replace AC #2 and condenser in room 1213, relocate AC #7, replace and relocate (AC #5) from room 1213C to 1213 in building PH1338, replace VFD at AHU-2 in second floor mechanical room at […]
Lot G Path of Travel Improvements
Scope included site fencing and appurtenances, partial demolition of existing parking lot spaces, sawcutting of existing concrete, modification to landscape islands and irrigation, new concrete paving, new bollards, new stripping, new curb ramps, and all other project elements as indicated in the construction documents prepared by the client. The project was successfully completed according to […]
CGI Concrete Flatwork
Removed 1,400 SF of existing decomposed granite and associated form boards along the North, West and South side of the College of Extended and Global Education building. Removed soil to provide final concrete finish around areas of the existing building. Recompacted area and installed a concrete sidewalk with rebar reinforcement, thickened edge slab and brook […]